Praxair/Tafa Arc Spray
Aluminum Wire – 01T
Made exclusively for arc spraying, 01T Aluminum is highly
resistant to atmospheric corrosion. The coating acts as a
galvanic corrosion inhibitor and also forms an oxide film
producing a protective coating, thus, is recommended under a
variety of environmental conditions and is used exclusively on
submerged water applications. For long-term anti-corrosive
applications, aluminum should be covered with a protective
5-8 mil layer of a suitable sealer, in all but mild rural
applications. Aluminum 01T meets the following specifications:
MIL-STD-2138A (SH), Metal Sprayed
Coatings for Corrosion Protection
Department of Defense MIL-W-6712C Table II, Aluminum
PWA 1320F
SNECMA DMR33-012
Garrett FP5045
GE CF6 Overhaul Manual operation number 70-49-40
Praxair/Tafa Arc Spray Zinc –
02Z
Made exclusively for arc spraying, zinc 02Z is primarily
designed for use as an EMI/RFI shield, capacitor end
spraying and protective anti-corrosion coating for
general oxidation resistance. Arc spray 02Z is 99.99% pure, and
is not contaminated in the arc spray process. Zinc 02Z wire
meets the Department of Defense Specification MIL-W-6712C, Table
II, Zinc. Traditional applications of zinc have been primarily
for corrosion protection, both in the atmosphere and in the
marine environment for long-term anti-corrosive service.
Praxair/Tafa Arc Spray Pure Tin Alloy Wire – 02W
Made exclusively for arc spraying, pure tin is a low melt
material with excellent solderability, conductivity and
corrosion resistance. Arc spray tin wire meets Department of
Defense Specification MIL-W-6712C, Table II, Tin. This wire is
commonly used in electrical applications to produce
solderable coatings for electrical connections and as a very
effective EMI/RFI shield. It is also extremely
corrosion resistant to a variety of chemicals and solvents
and may be used as a tank liner in some applications.
Lastly, we maintain a wide selection of wire products in
stock, eliminating costly delays waiting for products to arrive,
some as long as 2 weeks in order for a project to begin. Each
project is unique and specifications too numerous to list here,
so please contact us to discuss your specific requirements.
|